• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • SPECTRA banner
  • Curtiss-Wright banner

BATTLESPACE Updates

   +44 (0)77689 54766
   

  • Home
  • Features
  • News Updates
  • Defence Engage
  • Company Directory
  • About
  • Contact

US Army approves JLTV Full-Rate Production

June 22, 2019 by

21 Jun 19. Dr. Bruce Jette, Assistant Secretary of the Army for Acquisition, Logistics and Technology, approved the Joint Light Tactical Vehicle (JLTV) program’s transition into Full-Rate Production yesterday.

The approval follows an Army decision in December 2018 to begin fielding the new platform with the Army’s 1st Brigade, 3rd Infantry Division, Fort Stewart, Georgia, in April. The 1-3 ID became the Army’s first unit equipped with JLTVs in April 2019, after receiving more than 300 vehicles.

Fieldings to the Ordnance School, Fort Lee, Virginia, the 84th Training Command, Fort McCoy, Wisconsin, the Marine Corps’ School of Infantry-West at Camp Pendleton, California, as well as the School of Infantry-East, Camp Lejeune, North Carolina, have also been completed.

“Thanks to tremendous teamwork across two services on requirements, resources, program management, testing, and other areas, this is a great modernization success story. JLTV shows how teams focused on stable requirements, mature technologies and the right incentives can deliver meaningful capability advancements in a cost-conscious way,” said Jeffrey White, Jette’s principal deputy.

The JLTV family of vehicles is designed to restore payload and performance that were traded from light tactical vehicles to add protection in recent conflict, giving commanders an improved protected mobility solution and the first vehicle purpose-built for modern battlefield networks.

“Getting an improved capability into the hands of Soldiers and Marines has been our team’s driving focus throughout this program,” said Michael Sprang, Project Manager, Joint Program Office, Joint Light Tactical Vehicles. “They are why we do what we do, and I’m so proud of the hard-working team that brought us to this point.”

“We are also grateful for Soldier feedback on new features and enhancements,” he continued. “The Soldiers of the 1st ABCT, 3rd Infantry Division provided valuable input on enhancements such as increased situational awareness, reduction of system noise, a troop seat kit, and a companion JLTV trailer. Their assessments helped bring us all to a successful Full-Rate Production decision.”

The JLTV program remains on schedule and on budget to replace a significant portion of the Army’s High Mobility Multipurpose Wheeled Vehicle fleet. The JLTV comes in two variants and four mission package configurations: General Purpose, Close Combat Weapons Carrier, Heavy Guns Carrier, and a Utility vehicle. The U.S. Navy and Air Force also plan to field JLTVs in much smaller quantities.(Source: US Army)

 

Primary Sidebar

Advertisers

  • Pythia
  • Teledyne
  • Exensor
  • Visit the Oxley website
  • Blighter
  • SPECTRA
  • Britbots logo
  • Faun Trackway
  • Systematic
  • CISION logo
  • ProTEK logo
  • ProTEK logo
  • ssafa logo
  • IEE
  • EXFOR logo
  • sibylline logo
  • Team Thunder logo
  • Comtech logo
  • GoExporting logo
  • ECHODYNE logo
  • Supercat logo
  • Galvion logo
  • Leonardo DRS logo
  • MTC logo
  • IDC logo
  • DSEI logo
  • DVD2024 logo
  • SDSC logo
  • TELEDYNE FLIR logo
  • VeteranUK logo
  • Matrix Space logo
  • ST Engineering logo
  • EWS logo
  • sentinel photonics logo
  • capua logo
  • Curtiss-Wright logo
  • Brave1 logo
  • Drone Evolution logo
  • AEI Systems logo
  • EOS logo
  • NMSUK logo
  • Openworks logo
  • Sandown Park logo
Hilux UKDSE AARTOS ST Engineering Future Artillery

Contact Us

BATTLESPACE Publications
41 St Georges Drive
London SW1V 4DG

+44 (0)77689 54766

BATTLESPACE Technologies

An international defence electronics news service providing our readers with up to date developments in the defence electronics industry.

Recent News

  • Protek Selected By Dutch Armed Forces

    May 2, 2026
    Read more
  • PARLIAMENTARY QUESTIONS

    May 1, 2026
    Read more
  • MANAGEMENT ON THE MOVE

    May 1, 2026
    Read more

Copyright BATTLESPACE Publications © 2002–2026.

This website uses cookies to improve your experience. If you continue to use the website, we'll assume you're ok with this.   Read More  Accept
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT