18 Jan 24. MoD Equipment Plan 2023-2033 scrutinized by PAC.

Evidence Session

The Equipment Plan 2023-2033

Monday 22 January, 4pm, Grimond Room, Portcullis House

Watch live or on catch-up on Parliamentlive.tv

The Public Accounts Committee holds an evidence session on the Equipment Plan 2023-2033 at 4pm on Monday 22 January.

The Ministry of Defence (MoD) publishes an annual Equipment Plan, where it sets out its spending plans on equipment procurement and support projects over the next decade to keep the nation secure.

The Committee’s report on the MoD’s 2022-32 Plan found that equipment is arriving into service many years late and significantly over-budget with depressing regularity. It concluded that neither taxpayers nor the Armed Forces were being served well, that the system was broken, and in need of meaningful change.

The National Audit Office’s report into the MoD’s 2023-33 Plan found that it is unaffordable. The MoD estimates that forecast costs exceed its available budget by £16.9bn. The largest cost increases were to be found in nuclear and naval programmes, where combined costs have risen by £54.6bn.

Based on the NAO report, the Committee will take evidence from senior MoD officials on subjects including:

  • The Plan’s underlying data and assumptions;
  • Adaptability to international volatility;
  • How the MoD will manage impacts to the Plan’s affordability, including inflation.

From 4pm:

  • David Williams CB, Permanent Secretary at Ministry of Defence
  • Tom Wipperman, Director of Strategic Finance and Investment Approvals at Ministry of Defence
  • Andy Start, Chief Executive, Defence Equipment & Support at Ministry of Defence
  • Lt General Sir Robert Magowan CB CBE, Deputy Chief of the Defence Staff (Financial and Military Capability) at Ministry of Defence

18 Jan 24. Defence Committee to examine the future of combat air, including GCAP.

Evidence session: Future Aviation Capabilities

Wednesday 24 January, 14.30, CR8

Watch live on parliamentlive.tv

On Wednesday 24 January, at 14.30, the Defence Committee will continue its inquiry into future aviation capabilities, hearing from BAE Systems, AERALIS, Spirit AeroSystems, the Confederation of Shipbuilding and Engineering Unions and Unite the Union.

The first panel will explore the progress made on the Global Combat Air Programme (GCAP), which is currently working towards the “Tempest” aircraft. Questions are likely to cover the industrial relationship between partners in Italy and Japan, the potential for multi-year funding and expectations for final capability requirements.

Witnesses in the second panel are likely to be asked whether the Government is delivering on the promises in its Combat Air Strategy. In the final panel, Members are

likely to examine the strengths and weaknesses of the aviation sector and workforce.

Approximately 14.30, Wednesday 24 January:

  • Simon Barnes – Group Managing Director Air at BAE Systems
  • Herman Claesen – Managing Director Future Combat Air Systems at BAE Systems

Approx. 15.10:

  • Tristan Crawford – CEO at AERALIS
  • Nick Laird CBE – Managing Director of European Space and Defence at Spirit AeroSystems

Approx. 15.50:

  • Ian Waddell – General Secretary at The Confederation of Shipbuilding and Engineering Unions (CSEU)
  • Mr Rhys McCarthy – National Officer for Aerospace and Shipbuilding at Unite the Union

17 Jan 24. Sir Jeremy Quin MP has been elected Chair of the Defence Committee. The results of the election were announced in the Chamber this afternoon following a ballot of the whole House. Also on the ballot paper was Rehman Chishti.  Jeremy Quin served as Minister of State in the Ministry of Defence (Minister for Defence Procurement) 2020-2022.  During which period he launched the “Defence and Security Industry Strategy”, his responsibilities also included Defence Science and Technology, the Nuclear Enterprise and the Defence Estate.   After briefly serving in the Home Office as Minister for Police, Fire and Crime Prevention he was latterly Minister for the Cabinet Office and Paymaster General, piloting the Procurement Act through Parliament before leaving the Government in November 2023.   After his first election to the Commons in 2015 he joined the DWP Select Committee and played a leading role in Committee’s joint investigation into the BHS Pension Schemes which led to significant change in regulation.

Chair of the Defence Committee, Sir Jeremy Quin MP, said:   “I am delighted to have been elected Chair of the Defence Committee and would like to thank my parliamentary colleagues for their support. Russia’s invasion of Ukraine, the ongoing crisis in the Middle East and rising tensions in Indo-Pacific have increased global risk. As the world becomes more dangerous and volatile our way of life is increasingly under threat. These are profound challenges we have to be prepared to confront.  As the challenges we face evolve, so must our response.  Defence spending must grow to reflect the scale of the threat and the higher levels of geopolitical instability: investing in a Defence industry which must be at the forefront of the accelerating pace of technological development.   As Chair of the Defence Committee, I will push for increased funding and resources for Defence and will make the case for first-mover-advantage in our Defence technology, to maintain our competitive edge.  Most importantly, I will advocate for the brave men and women that make up our Armed Forces. The Committee will always focus on Defence’s ‘offer’ to Service men and women, to ensure that we hold on to the immense expertise we already have, and enable us recruit the talented personnel we need for the future.”

 

17 Jan 24. House of Commons Public Accounts Committee 

Significant risks for front-line armed forces caused by MoD inventory failures

– Government powerless to deal with fragmentation of inventory management

– PAC report reveals struggles with outdated systems and quality of data

The Ministry of Defence (MoD) does not have the powers needed to deal with the fragmentation of its inventory management. In a report published today, the Public Accounts Committee (PAC) warns that long-standing weaknesses remain in the management of the UK armed forces’ supplies and spares for immediate and potential use (collectively described as ‘inventory’).

Problems with inventory management can have serious knock-on consequences for those serving in the armed forces. For example, the PAC’s report highlights that the MoD failed to consider the needs of its medical operations as part of outsourcing commodity procurement to the ‘Team Leidos’ consortium. Units faced poor availability of medical inventory as a result and were supplied with items without the shelf life for longer deployments. The Royal Navy in 2022 assessed the situation as presenting a significant risk to life for its personnel if left unresolved, and in 2023 performance for medical had still not improved to the required level.

The report highlights serious issues with the MoD’s outdated inventory management systems, some of which are nearly forty years old. For instance, the Royal Navy’s base inventory system can record that an item is unserviceable, but not for what reason, meaning the MoD will not know what degree of repair it may need to be useful. The report calls for updates on measures the MoD is undertaking to improve the quality of its inventory data.

The PAC is concerned that new posts established by the MoD to bring coherence to inventory management do not have the powers needed to deal with the fragmented system, instead relying on influencing to improve the situation. While a £2.5bn project aimed at resolving historic issues faced in managing inventory is in place, the PAC is sceptical about MoD’s ability to realise these complex and ambitious plans in time, given both its patchy track record and staffing gaps of around 25% in the relevant programmes. Given that future conflicts may require sudden surges in demand and industrial capacity, which industry may need support to provide, the report also seeks information on how the Government intends to work with industry to ensure greater resilience in its inventory management.

Dame Meg Hillier MP, Chair of the Committee, said:  “Our brave armed forces personnel put themselves in harm’s way in defence of our nation, and deserve to expect that the equipment they require to do so will be there when they need it. Our Committee warned over a decade ago of waste and fragmentation in the MoD’s supply systems, and our report finds that many of those problems remain unresolved and without the right powers to address them.

“We were also concerned to hear as part of our inquiry that a contract for a £515m programme to address data gaps was awarded to a large defence prime contractor without a competitive tendering process. The MoD must of course continue to do everything in its power to address these issues at pace while ensuring value for money. Blind spots in the system must be brought into sharp focus, and lessons from the war in Ukraine and the pandemic urgently implemented to ensure resilient supply. We live in an increasingly volatile and unpredictable world. The future must not find us under-prepared.”

PAC report conclusions and recommendations

The MoD’s Chief of Defence Logistics and Support does not have the powers needed to deal with the fragmentation of its inventory management. Front Line Commands historically managed their own inventories, while Defence Equipment and Support (DE&S) manage the MoD’s central warehousing and the procurement of much of its inventory. This has created a complex organisational set-up with inefficient working practices. The MoD established the post of Chief of Defence Logistics and Support (CDLS) and the Defence Support function in 2019 to cohere MoD’s inventory management, with the aim of implementing strategy, policies and standards across the MoD and its defence organisations. We are concerned, however, that CDLS does not have the power to direct these organisations, instead relying on influencing to improve inventory management. A recent internal review found that Defence Support and DE&S need to be much more integrated, and DE&S’s past behaviours have not been conducive to collaboration and external challenge. The MoD considers that the behaviours and culture across defence have already started to become more integrated, though it accepts that the change needed may take years, and is looking at how to grant CDLS the power of authority to direct the single services to take action or not.

Recommendation: In its Treasury Minute response, the MoD should set out the steps it has taken to provide CDLS and the Support function with the right levers and authority to implement its Support Strategy to achieve the 2025 strategic outcome “waypoints” (towards the 2035 goals).

The MoD’s inventory management systems remain outdated, and the quality of its data limits its ability to understand its inventory. MoD’s inventory management has faced long-standing issues with its many legacy IT systems, which have limited functionality and reinforce the fragmentation of its inventory management. While it has reduced the number of Support systems from around 250 in 2010 to 89 today, the two base inventory management systems used by the Army and Royal Navy respectively are nearly 40 years old. The MoD acknowledges that, while its visibility of its inventory is generally good, its system functionality can prevent staff from having a deeper understanding of it. For example, the Royal Navy’s base inventory system can record that an item is unserviceable, but not for what reason, meaning the MoD will not know what degree of repair it may need. In 2010, the MoD entered into a £800m contract with Boeing Defence UK called Future Logistics Information Services (FLIS) that was due to run until 2022.  However, in late 2020 the MoD signed a five-year contract extension worth £515m called “Bridging the Gap”, which the MoD explained at the time would “provide capability that Bridges the Gap between the FLIS contract and the future long-term strategic solution, known as the Business Modernisation for Support (BMfS) project”. The MoD’s short-term plan for Bridging the Gap is to move the Army and Royal Navy onto an upgraded version of the Royal Air Force’s more modern inventory system. We do not see, however, how this step alone will address the existing gaps in its data. We are also concerned to hear that the MoD awarded the contract for this £515m programme to a large defence prime contractor without a competitive tendering process.

Recommendation: Within six months, the MoD should provide an update to us setting out progress against its plans for the Bridging the Gap project, as well as any other measures it is undertaking to improve the quality of its inventory data. This should specifically address the likelihood that a further contract extension will be required to complete the Future Logistics Information Services work, and the expected cost and duration of any such extension.

The MoD’s transformation plans are complex and ambitious, but its track record means we are sceptical about its ability to achieve them. The MoD has put in place the £2.5bn Business Modernisation for Support (BMfS) programme to upgrade its legacy IT infrastructure and introduce aligned business processes across its bodies. This programme is intended to resolve many of the historic issues the MoD has faced in managing its inventory, however it is highly complex: transforming services for around 65,000 users across Defence whilst maintaining operations throughout. The MoD’s track record in delivering business and digital transformation is patchy, and the Committee is concerned about the level of skills and personnel available to MoD to manage these programmes. The MoD faces staffing gaps of around 25% across both BMfS and its Future Defence Support Services (FDSS) programme, which aims to find the best commercial arrangements for inventory management from 2028. While the MoD told us it has brought in digital skills for BMfS, it acknowledged that the staffing gaps create risks for FDSS, though it is confident it can still meet the 2028 target delivery date through sensible prioritisation.

Recommendation: In its Treasury Minute response, the MoD should write to us setting out progress on its Support transformation programmes, how it is ensuring it has the right skills and experience to deliver them, and how it will engage with industry in doing so.

MoD will need to work closely with industry to ensure resilience in its supply chains. The MoD outsourced its central warehousing and the procurement of some of its commodities – food, clothing, general and medical supplies – to a consortium under the “Team Leidos” banner through the Logistics Commodities and Services Transformation (LCST) contract in 2015. This has been successful overall, forecast to generate financial efficiencies of £403m over the life of the contract and has increased the agility of MoD’s supply operations. The MoD is looking at incorporating the learning from the LCST contract into its £1.8bn FDSS programme for future contracts which will replace LCST in 2028. The CDLS admits FDSS is a large, complex piece of work which he is expecting will require external advice. FDSS provides a once in a generation opportunity to merge important inventory-related software contracts into a single programme. Recent events, such as the war in Ukraine and covid-19, have brought about a reassessment of how the MoD should manage its inventory, away from prioritising efficiency to ensuring greater resilience. Ukraine and previous conflicts have also highlighted the importance of protecting support networks. For example, the MoD stated that throughout its recent operations in Afghanistan, 60% of casualties were among personnel involved in force protection of lines of communication, such as convoys of fuel or stores. Future conflicts may require sudden surges in demand and industrial capacity, which industry may need support to provide. MoD told us it helped develop a North Atlantic Treaty Organisation (NATO) defence production action plan to signal demand clearly to industry and the MoD plans to invest around £2.4bn in strengthening supply chains. In the longer term it intends to create an “always-on” demand pattern to create a more robust supply chain.

Recommendation: In its Treasury Minute response, the MoD should update on its plans for how it intends to work with industry ensure greater resilience in its inventory management, including its £2.4bn of investment in supply chains.

  • Within six months, the MoD should inform the Committee by letter of the lessons learned from its review of the LCST contract and how it will implement these.
  • Within twelve months the MoD should provide a progress report to the Committee on its plans for merging the LCST contract and a number of similar contracts into FDCC programme. In particular, the MoD should set out how well the IT software programmes are being developed to support the logistics consolidation.

The MoD failed to consider the needs of its medical operations in outsourcing commodity procurement to Team Leidos and this has created significant risks for front-line personnel. Since the LCST contract began, the inventory needs of front-line medical personnel have not been well served. In particular, units have faced poor availability of medical inventory and been supplied with items without sufficient shelf life for longer deployments. In 2022, the Royal Navy assessed that, if unresolved, the situation would present a significant risk to life for its personnel. This issue arose because the contract applied a general target across all commodity supply. This meant that lower performance in supplying medical inventory (which generally requires higher performance than other commodities) was masked by better performance elsewhere. Furthermore, there is granularity within what is needed for certain elements of medical inventory: the MoD cited 90%, 95% and 98% inventory level requirements for different medical equipment.  For the average inventory of “fast-moving commodity type medical items”, the MoD told us that Team Leidos was now achieving the 92% level “on a regular basis”.  From 2019, the MoD changed the incentivisation in the contract to hit time targets and deliver new projects and equipment faster, which improved the situation but still not to the required level. However, in 2023 because performance for medical had still not improved to the required level, the MoD approved further improvement initiatives which will ultimately require it to pay the supplier a further £13.2m.

Recommendation: In its Treasury Minute response, the MoD should write to us setting out how it will ensure that the requirements of medical personnel will be properly addressed in its future inventory management arrangements, and how it will resolve risks more quickly in future. This should include providing data on a quarterly or monthly basis of how performance in the supply of medical inventory has changed over the life of the LCST contract, including performance against target inventory level requirements for different sub-sectors of medical equipment as well as the overall medical equipment inventory target. Alongside this, the MoD should set when it expects to consistently achieve each of these targets.

While the MoD has reduced the amount of stock it holds, it still holds large amounts of excess and unserviceable inventory. From 2011 to 2023, the MoD told us it achieved a 25% reduction in the net book value of its inventory, which it reduced from £16bn to £12bn. However, it is still holding substantial amounts of inventory that is unserviceable, overstocked or beyond the service date of its related platform. The MoD argues that there are many complex reasons for these build-ups of stock. For example, unserviceable inventory may still be useful if repaired, and other items are overstocked for contingency scenarios. It also stated that activity supporting the front line will always take priority over managing disposals, and the move towards building resilience will increase the level of inventory being held in future. Nonetheless, it acknowledged that its decision-making needs to be informed by better data; for example, missing data on why inventory is unserviceable makes it difficult to understand what should be disposed of. The MoD has now put in place projects to target disposals, but these are disparate and some areas, particularly the Royal Air Force, have achieved more than others.

Recommendation: In its Treasury Minute response, the MoD should set out how it is improving its ability to understand which inventory items need disposing of, and ensuring this is done so consistently. It should also set out details of any targets it has to reduce the amount of the overall inventory and particular areas.

 

House of Commons and House of Lords Hansard Written Answers

 

Nuclear Power: Infrastructure

Question for Ministry of Defence

John Healey

Labour

Wentworth and Dearne

Commons

To ask the Secretary of State for Defence, what assessment his Department has made of the adequacy of the UK’s nuclear infrastructure.

 

Answer

James Cartlidge

Conservative

South Suffolk

Commons

Answered on 17 January 2024

We continue to manage the well documented challenges associated with maintaining the UKs defence nuclear infrastructure. Defence is upgrading or replacing elements of nuclear infrastructure to ensure it remains reliable and safe. This includes investment of £1.4 billion into nuclear facilities and nuclear infrastructure at HMNB Clyde to extend the design life, delivering the modifications and upgrades necessary to receive the Dreadnought Class.

 

Type 26 Frigates: Procurement

Question for Ministry of Defence

Mr Tobias Ellwood

Conservative

Bournemouth East

Commons

To ask the Secretary of State for Defence, if he will publish a list of the (a) sea trial and (b) operational start date for each Type 26 frigate.

 

Answer

James Cartlidge

Conservative

South Suffolk

Commons

Answered on 17 January 2024

The Initial Operating Capability for the Type 26 Class is forecast to be October 2028. All ships are expected to enter service between 2028 and 2035. To avoid compromising operational security, the Ministry of Defence does not routinely disclose individual out of service dates or specific in-service dates for warships to avoid revealing elements of the Fleet’s long-term schedule. However, the Royal Navy continues to ensure that it has sufficient assets available to deliver operational outputs.

 

Ukraine: Military Aid

Question for Ministry of Defence

Jim Shannon

Democratic Unionist Party

Strangford

Commons

To ask the Secretary of State for Defence, if he will make an assessment of the potential merits of allocating additional funding for military support for Ukraine.

 

Answer

James Heappey

Conservative

Wells

Commons

Answered on 17 January 2024

We remain committed to supporting Ukraine’s right to be a sovereign, independent and democratic nation.

This is why on 12 January, on his visit to Kyiv, the Prime Minister announced that the UK will provide an additional £2.5 billion in military aid to Ukraine during Financial Year 2024-25, an increase of £200 million on the previous two years.

 

Ajax Vehicles: Procurement

Question for Ministry of Defence

John Healey

Labour

Wentworth and Dearne Commons

To ask the Secretary of State for Defence, how many Ajax vehicles have been (a) manufactured, (b) delivered to the Army and (c) accepted by the Army.

 

Answer

James Cartlidge

Conservative

South Suffolk

Commons

Answered on 17 January 2024

152 Ajax vehicles have been manufactured to date; 44 of these have been delivered to the Army to allow training and experimentation. The latest standard of the vehicle, which forms the deployable capability, has now been accepted by the Department and deliveries are on track to meet the Initial Operating Capability.

 

Primary Sidebar

Advertisers

  • Pythia
  • Teledyne
  • Exensor
  • Visit the Oxley website
  • Blighter
  • SPECTRA
  • Britbots logo
  • Faun Trackway
  • Systematic
  • CISION logo
  • ProTEK logo
  • ProTEK logo
  • ssafa logo
  • IEE
  • EXFOR logo
  • sibylline logo
  • Team Thunder logo
  • Comtech logo
  • GoExporting logo
  • ECHODYNE logo
  • Supercat logo
  • Galvion logo
  • Leonardo DRS logo
  • MTC logo
  • IDC logo
  • DSEI logo
  • DVD2024 logo
  • SDSC logo
  • TELEDYNE FLIR logo
  • VeteranUK logo
  • Matrix Space logo
  • ST Engineering logo
  • EWS logo
  • sentinel photonics logo
  • capua logo
  • Curtiss-Wright logo
  • Brave1 logo
  • Drone Evolution logo
  • AEI Systems logo
  • EOS logo
  • NMSUK logo
  • Openworks logo
  • Sandown Park logo
Hilux UKDSE AARTOS ST Engineering Future Artillery

Contact Us

BATTLESPACE Publications
41 St Georges Drive
London SW1V 4DG

+44 (0)77689 54766

BATTLESPACE Technologies

An international defence electronics news service providing our readers with up to date developments in the defence electronics industry.

Recent News

  • Protek Selected By Dutch Armed Forces

    May 2, 2026
    Read more
  • PARLIAMENTARY QUESTIONS

    May 1, 2026
    Read more
  • MANAGEMENT ON THE MOVE

    May 1, 2026
    Read more

Copyright BATTLESPACE Publications © 2002–2026.

This website uses cookies to improve your experience. If you continue to use the website, we'll assume you're ok with this.   Read More  Accept
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT