Sponsored by American Panel Corporation
http:// http://american-panel.com/
————————————————————————-
UNITED KINGDOM
23 Aug 17. Geographic Information Systems
B2B Quote Ref no: B2B546180
Location: South West
Register Interest Deadline: Wednesday, September 13, 2017
Submit Documents Deadline: Wednesday, September 13, 2017
Provision of MIS Website and GPS Tracker System.
(Source: B2B.com)
22 Aug 17. Defence Related Research Support and Analysis
B2B Quote Ref no: B2B545616
Location: South East
Register Interest Deadline: Friday, October 06, 2017
Submit Documents Deadline: Friday, October 06, 2017
Provision of research and analysis services to support the delivery of analysis to inform Defence policy and strategy development.
(Source: B2B.com)
18 Aug 17. Bulk Fuel Facility Upgrade
B2B Quote Ref no: B2B544933
Location: South East
Register Interest Deadline: Monday, September 11, 2017
Submit Documents Deadline: Monday, September 11, 2017
Provision of an upgrade to a Bulk Fuel Facility (BFI) 1912, and provide a fuel line from BFI 1912 to Victor Ramp. This includes the new installation of hydrant pits at Victor Ramp.
(Source: B2B.com)
18 Aug 17. Battlefield Management Solution
B2B Quote Ref no: B2B544610
Location: South West
Register Interest Deadline: Monday, September 18, 2017
Submit Documents Deadline: Monday, September 18, 2017
Delivery of a battlefield management solution with geo-spatial services, operating picture, mission planning and execution, plus ORBAT / task org edit functionality.
(Source: B2B.com)
18 Aug 17. Supply of Ammunition – Prior information notice
B2B Quote Ref no: B2B544667
Location: South West
Register Interest Deadline: Wednesday, October 18, 2017
Submit Documents Deadline: Wednesday, October 18, 2017
5.56mm Ballistite/Line Thrower Blank Round. – Prior information notice
(Source: B2B.com)
18 Aug 17. UK explores Multi-Role Support Ship concept. Key Points:
• The MRSS pre-concept study is due to report in 2018
• MRSS will address future amphibious, forward repair, and medical capability requirements
The UK Royal Navy (RN) has instigated a package of studies to explore a future multi-role platform that could potentially address a range of requirements for replacement amphibious, forward repair, and medical capabilities. Due to report in 2018, the pre-concept Multi-Role Support Ship (MRSS) study – being carried out by the Ministry of Defence’s Naval Design Partnering (NDP) team in conjunction with Navy Command Headquarters (NCHQ) – is examining both technical and commercial aspects. One of the key drivers for the MRSS pre-concept work is the need to consider options for the long-term replacement (beyond 2030) of the amphibious assault ships HMS Albion and HMS Bulwark. (Source: IHS Jane’s)
EUROPE
16 Aug 17. Netherlands-Utrecht: Military electronic systems, 2017/S 155-322917. Prior information notice for contracts in the field of defence and security. Supplies Directive 2009/81/EC
Section I: Contracting authority/entity
I.1)Name, addresses and contact point(s)
Ministerie van Defensie, Defensie Materieel Organisatie, Inkoop IT
431575409
Herculeslaan 1
For the attention of: Marianne de Vries
3584 AB Utrecht
Netherlands
Telephone: +31 302184484
E-mail:
Fax: +31 302184102
Internet address(es):
General address of the contracting authority: https://www.defensie.nl/organisatie/dmo
Further information can be obtained from: The above mentioned contact point(s)
Section II: Object of the contract
II.5)Common procurement vocabulary (CPV)
35700000 – FB01 – FB13
Description
Military electronic systems.
II.6)Scheduled date for start of award procedures and duration of the contract
Scheduled date for start of award procedures: 14.8.2017
(Source: Europa TED)
17 Aug 17. Denmark-Ballerup: Surveillance and security systems and devices, 2017/S 156-324400. Prior infor